ICON – The Hut Group, Manchester

Dji 0013 980X650
Img 0809
Location Manchester, England
Timescale 28 weeks
Client Graham IFO

Premier Electrics delivered the electrical design and CAT. B installation of ICON, The Hut Group’s new £150m warehouse, logistics and media creation studios at Manchester Airport.

The project consisted of three distinct parts including:

    • CAT-B shell & core fitout of a 480,000 sq/ft warehouse and distribution unit.
    • CAT-A alterations then CAT-B fitout of the 21,000 sq/ft warehouse office.
    • CAT-A alterations then CAT-B fitout of the high specification 4-storey, 105,000 sq/ft main office.
    6
    5