PINEWOOD STUDIOS

Projects

PINEWOOD STUDIOS

Buckinghamshire, England
Client: Simons Group

Premier Electrics successfully delivered this complex programme of works for the North Dock & E Stage at Pinewood Studios.

The refurbishment project included the strip pit, fire hydrants, sprinkler, water mains and decommissioning of existing generators & HV switchgear.

Double redundancy generator supplies were required due to the sensitivity of areas protected while a new 11KV ring circuit & Network transformer installation was provided. Power was maintained to critical systems throughout the project.